
Project 01
Crosspoint Bridge
A 1.4km overpass built above live traffic — zero incidents, zero delays.
Summit Structura
Infrastructure Status
Central Expressway Corridor
Project Overview
Crosspoint Bridge handles over 80,000 vehicle movements per day. Built with a post-tensioned concrete deck and a 120-year design life — this is infrastructure built to outlast the city it serves.
Challenge:
Constructing above live traffic lanes with zero tolerance for debris, vibration, or unplanned lane closures.
Solution:
Full overhead protection system installed. All above-traffic work completed on approved night-shift windows only.
